Printable template

A content workflow template your team can actually use.

Copy or print a practical content workflow template with owners, statuses, hand-off criteria, approvals and release checks.

This template turns a piece of content into a visible series of hand-offs. Copy it into a document, board or spreadsheet, or print this page. Keep the fields that change a decision; remove decorative fields that nobody uses.

1. Content identity and brief

FieldEntry
Content ID
Working title
Audience and need
Intended outcome
Core message
Evidence or source links
Format and adaptations
Accountable owner
Desired release window
Rights, brand or disclosure constraints

Brief-ready gate

2. Stage record

Use one row per hand-off. A status should describe the actual state, not the state somebody hopes to reach before the next meeting.

StageWorking ownerRequired inputsCompletion evidenceNext ownerEscalation condition
CreateApproved brief and source materialIdentified review candidateReview ownerMissing source, rights or production dependency
PlanBrief and formatDestinations, adaptations, dependencies and intended timingRelease ownerConflict, embargo or infeasible format
ReviewReview-ready version and review matrixRecorded decision bound to versionCreation or release ownerConflicting feedback or unavailable approver
DistributeApproved release packageVerified destination state and recordMeasurement or archive ownerRejection, processing error or unexpected published result

3. State model

  1. Idea: a possible item exists, but no accountable brief has been accepted.
  2. Brief-ready: inputs are sufficient for a planning decision.
  3. Approved brief: production is authorised to begin.
  4. In production: a working owner is developing the item.
  5. Review-ready: a specific version meets the hand-off gate.
  6. Changes requested: recorded issues must be resolved.
  7. Approved: a decision owner has approved a specific version and scope.
  8. Release-ready: destination packaging and final checks are complete.
  9. Submitted or scheduled: a destination accepted an instruction; publication is not verified.
  10. Released: the intended audience can access the item and the result was checked.
  11. Measured or retired: the outcome was reviewed or the item withdrawn.

Do not collapse “submitted”, “scheduled” and “released”. They describe different evidence.

4. Review and approval record

FieldEntry
Candidate ID and version
Review type(s) requiredFactual / brand / rights / accessibility / destination / other
Reviewer(s)
Final decision owner
DecisionChanges required / approved with conditions / approved / stopped
Conditions and owners
Decision time
Approval scopeAsset, copy, destinations and duration covered
Changes that invalidate approval

Feedback should identify the location, issue, reason and requested action. Advice should not be presented as a mandatory correction. Silence should not count as approval unless a formally authorised policy defines that rule.

5. Release-readiness checklist

6. Release outcome record

FieldEntry
Release package/version
Destination and account
Request owner and time
Destination item ID or URL
Returned stateScheduled / submitted / processing / published / failed / rejected / cancelled
Verification owner and time
Audience-view check
Error or warning
Retry, correction or removal owner

7. Worked example

Example only: ART-018 is an article with one newsletter adaptation. The brief owner supplies the audience, approved evidence and intended September release window. Creation produces ART-018 v4; factual and brand reviewers complete separate checks. The decision owner approves the article and newsletter introduction, but not future social adaptations.

The release owner assembles the approved article page, verifies links and alternative text, and submits it to the destination. The system reports processing, so the item is not marked released. After an audience-view check confirms the page, the owner records the URL, time and released state.

How to adapt the template

For routine items, combine the identity and stage records and keep a short release checklist. For high-impact work, retain specialist review evidence and a contingency owner. If a field never informs ownership, readiness, approval or outcome, remove it. If a recurring decision is made only in messages or memory, add the smallest field that makes it visible.